Watergates 2 and 3
Yorkshire Dales Classic Trial
Moving the start to Pately Bridge meant that the sections at Watergates were only about 10 minutes away from the start, and were tackled first. I have been to Watergates many times before as part of the Ilkley trial, but this year I concentrated on the upper two sections, Section 2 was tackled by both cars and bikes and Section 3 was only tacked by bikes